Please Send It Log in Try for free
FrançaisEnglish

Automatic multichannel reminders

Tired of chasing people for paperwork, info or a signature?

Say which information / documents, from whom and by when. Please Send It reminds everyone, politely, until everything is in.

Rather not type? Just say it

Say in one sentence what you need and from whom: we prepare the campaign for you. You first create your free account, in 30 seconds.

Free, no credit card. Ready in 3 minutes.

Please Send It follows up for me, politely, until everything arrives.

Every file received is checked, renamed and saved to my Drive. And a dashboard shows me where everyone stands, at any time. Handy, right?

And to say thank you, I send a card or flowers, in one click.

Tom, a Please Send It user: a smiling young man with brown hair, in a navy sweater, thumbs up, phone in hand

A service of PAPEL SAS, a French company.

The solution

Simple. Automatic.
Ready in 3 minutes.

JJulieMMarcSSofiaYou
  1. 1 minList the documents you need, and their format.
  2. 1 minAdd the contributors. Everyone sends the same thing, or each their own.
  3. 1 minSet the deadline and how often to remind them. Done.

On their side

One link. One photo.
Sent.

Everyone gets a personal link by email or text message. No account to create, no app to install: they snap their document with their phone, and that's it.

The upload page on a phone: Camille Durand asks for 8 answers and 4 files, the request is 52% complete, and each item shows where it stands: received, checked, watermarked, encrypted, being checked or to send again

On your side

Every document. From everyone.
On time.

Please Send It keeps at it, at the pace you chose, harder the day before the deadline, and stops as soon as someone has sent everything. You see at a glance who sent what, and everything arrives sorted, one folder per person. A document you need every month, quarter or year? The campaign goes out again on its own, right on schedule.

A campaign dashboard: nothing to do for now, 9 documents received out of 12, 3 on the way, messages sent, documents requested and each contributor’s progress
A relaxed man on a café terrace, coffee in hand, smiling at his phone

And meanwhile?
You grab a coffee.

No more lists to keep, no more awkward messages to resend. You get notified when everything is in.

What else? ;)

E-signature

A contract to get signed?
Signed online, chased until it's done.

Please Send It also handles electronic signatures. Add the document to sign to your request: everyone signs from their phone, nothing to print, and reminders keep going until the signature is in. You get the signed PDF back, with its certificate.

Sensitive documents

ID card, bank details, payslip.
Protected by default.

Nothing to set up: it is automatic, on every plan, Free included. Learn more

Got a link?

Someone is asking you for documents. Open the link you received: no account needed to send. With an account, you can find your uploads again and change them until the deadline.

Your files stay between you

Only the person who asked can see the documents you send. Sensitive documents encrypted and deleted after 30 days. No trackers, no ads. Your data

Connectivity

Plugged into the tools you already use.

One-click sign-in

No extra password: sign in with the account you already have.

Automatic copy of your documents

Every document received is filed in your own storage, by campaign and by contributor.

AI agents and automations

MCP server and public API: your assistants and tools create and track campaigns for you. Connect to Claude or ChatGPT in one click.

Via your assistant's connectors:

Channels

Each reminder goes out on the right channel, at the right time, until everything is in.

A follow-up tool, not a prospecting tool: you remind people you already have a relationship with, about a specific request. Learn more

Who is it for?

Everyone has papers to collect.
Find your use case.

For whom?

You are…

Among friends, with your providers, in class, as a freelancer or in a large company: Please Send It does a lot for everyone. Pick yours.

Templates

No idea where to start?
Pick a ready-made request.

Here are a few of our 266 templates. One template can suit several profiles.

Pricing

Free to start.
Pay only when it matters.

No mandatory subscription: pay for one campaign when you need it.

Choose your plan

Yearly: 2 months free. Prices incl. VAT.

A subscription for the service (free to start), tokens for the ammo (in packs). 1 token = €0.10, down to €0.09 in a pack of 1,000. Plans with SMS include tokens every month. Each channel costs:

  • Email20 free, then 1 token per 50
  • SMS2 tokens
  • WhatsApp3 tokens
  • Phone message3 tokens
  • AI agent call7 tokens
  • Letter40 tokens
  • Postcard45 tokens
  • Registered130 tokens
  • Small gift250 tokens
  • Champagne600 tokens

Petit pack 100 tokens, €10 · Middle pack 500 tokens, €47.50 · Big pack 1 000 tokens, €90

Compare the plans in detail

Free account first, then secure payment by Stripe. If you stop there, you keep a free account.

Your next campaign,
without chasing anyone.

Free, no credit card.